PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued laying out gravel at the Main Loby (102) Facing South (800x600).jpg Installed Areaway Drains Facing East (800x600).jpg Poured concrete at the subgrade column E.3-6.5 Facing North (800x600).jpg Continued fixing the main steel column at the Monumental Stairs Facing South (800x600).jpg Continued installing Stairs -2 (2nd Floor) Facing West (800x600).jpg
Next page Continued laying out gravel at the Main Loby (102) Facing South (800x600)
Continued laying out gravel at the Main Loby (102) Facing South (800x600)